Question on the 2nd run for (Tone Merchants or Brad)

  • Thread starter Thread starter gbsmusic
  • Start date Start date
gbsmusic

gbsmusic

Well-known member
So when the 1st run is done and shipped, is the 2nd run going to start production right away?
 
the next batch of amps will probably 6 to 8 weeks out. you figure it will take about a month to get all the parts, headshells, chassis etc and then we have to schedule the build.

the good news on our end, is we wont have to spend 6 months redesigning the amp. All we have to do is order everything and hope the manufacturers deliver when they say they are going to. If all goes well, then its 6 to 8 weeks.

i use to bust bogners chops because they never had amps in stock. They built runs of amps and now i understand why
 
Based on that how soon will the first run be finished?
Thanks
 
Tone Merchant":3oteddzq said:
the next batch of amps will probably 6 to 8 weeks out. you figure it will take about a month to get all the parts, headshells, chassis etc and then we have to schedule the build.

the good news on our end, is we wont have to spend 6 months redesigning the amp. All we have to do is order everything and hope the manufacturers deliver when they say they are going to. If all goes well, then its 6 to 8 weeks.

i use to bust bogners chops because they never had amps in stock. They built runs of amps and now i understand why
Thank you fot the answer and I in no way was trying to be negative, just trying to know an aprox time. Thanks again.
 
rokker":3s3vhqpv said:
Based on that how soon will the first run be finished?
Thanks
Chasis are due in for the first 25 amps on the 12th. The boards will be complete tomorrow to Tuesday. Barrang will need a few after the chassis come in to mount the transformers, wire the pots,etc. From what I can see their is no seperate board for the power supply. Final testing will then begin. I imagine they will complete one amp for testing first. Rob will have to drag Mark's ass down there to do it. If all goes well, which it will not, because Mark will request a few more tweaks(are you kidding me) :lol: :LOL:
Barrang will make the changes(it will be component value changes which will not require ordering) Realistically we will see amps ship week of September 12th. :rock: What say you?
 
glip22":3ucp5s98 said:
rokker":3ucp5s98 said:
Based on that how soon will the first run be finished?
Thanks
Chasis are due in for the first 25 amps on the 12th. The boards will be complete tomorrow to Tuesday. Barrang will need a few after the chassis come in to mount the transformers, wire the pots,etc. From what I can see their is no seperate board for the power supply. Final testing will then begin. I imagine they will complete one amp for testing first. Rob will have to drag Mark's ass down there to do it. If all goes well, which it will not, because Mark will request a few more tweaks(are you kidding me) :lol: :LOL:
Barrang will make the changes(it will be component value changes which will not require ordering) Realistically we will see amps ship week of September 12th. :rock: What say you?

Dang, you must be keeping a journal on this first run.... :D
 
steve_k":1fyoil3w said:
rlord1974":1fyoil3w said:
Gary should be on the payroll.....

:hys:

I am going to send Gary a cheerleading skirt and some ppm-poms...
:hys: I am trying to keep a positive attitude. You know as well as I that I don't really know any more than anyone else. Also I'm just having a little fun.
 
glip22":8x0x0xhb said:
steve_k":8x0x0xhb said:
rlord1974":8x0x0xhb said:
Gary should be on the payroll.....

:hys:

I am going to send Gary a cheerleading skirt and some ppm-poms...
:hys: I am trying to keep a positive attitude. You know as well as I that I don't really know any more than anyone else. Also I'm just having a little fun.
:thumbsup:
 
Gimme a C , gimme another C and a V.....

What do you got?

ROCK.....
 
I get the feeling Gary's only buying a CCV for the jokes.
 
Mark's customer goes into a bar. The bartender tosses him out as he is too drunk. He walks back into the bar. Again, the bartender throws him out for being too drunk. Again he walks into the bar. The bartender is just about the throw him out when Mark's customer looks at him and says, "How many bars do you own, anyway?"
 
lester":2e59nhb7 said:
Mark's customer goes into a bar. The bartender tosses him out as he is too drunk. He walks back into the bar. Again, the bartender throws him out for being too drunk. Again he walks into the bar. The bartender is just about the throw him out when Mark's customer looks at him and says, "How many bars do you own, anyway?"
I guess you had to be there. :scared: :lol: :LOL:
 
LP Freak":217sbtjx said:
lester":217sbtjx said:
Mark's customer goes into a bar. The bartender tosses him out as he is too drunk. He walks back into the bar. Again, the bartender throws him out for being too drunk. Again he walks into the bar. The bartender is just about the throw him out when Mark's customer looks at him and says, "How many bars do you own, anyway?"
I guess you had to be there. :scared: :lol: :LOL:

I thought it was funny. :D
 
LP Freak":1l5ojale said:
lester":1l5ojale said:
Mark's customer goes into a bar. The bartender tosses him out as he is too drunk. He walks back into the bar. Again, the bartender throws him out for being too drunk. Again he walks into the bar. The bartender is just about the throw him out when Mark's customer looks at him and says, "How many bars do you own, anyway?"
I guess you had to be there. :scared: :lol: :LOL:


Like my grandfather used to say; "I cut it off twice and it's still too short..."! :confused:
 
gbsmusic":10g0tts0 said:
Man, making those faces must be fun. Let me try--- :lol: :LOL: :rock: :emofag: :grim: :boxer: :boxer: :checkthisout: :hys: :m4: ---Nope.... It was just cheezy. C'mon Koko-words man.
 
Back
Top