CarlF
Well-known member
Just spoke w/ Banana At Large and put down my deposit. Considered the 45 for a second but I know if I didn't go for the 100 it would bother me.
2-3 month wait. I'm in on the first run, which is hand wired.
Maybe after I get it I'll go for the 2x12, but the cabs are expensive.
2-3 month wait. I'm in on the first run, which is hand wired.
Maybe after I get it I'll go for the 2x12, but the cabs are expensive.
Last edited: