Cameron CCV Update 08/04 *UPDATED*

  • Thread starter Thread starter Tone Merchant
  • Start date Start date
Sold the farm to get on the CCV first run....been a hard ride since 4/2/11...Seitz333 loaned me a Soldano for a while....been on the good ol' pod farm since.
It's all my fault....should not have put myself in this position....that's why I'm FLIPPED OUT!!!!!
 
rokker":38813u3e said:
I'm starting to feel cursed...every gear related move I make usually is not in my favor.
Either I sell at a loss to get something I think will work out only to be disappointed and wishing I had something I used to own.
The Cameron Jose I sold to get the CCV is cursing/haunting me.....please remove the evil spirits, maybe I need a seance with some other kind of spirits.
IF I can wait this one out it better work for me....as Brad knows I'm having trouble waiting...never waited this long for anything...EVER.


Hold out a little longer, won't be long now. The CCV is worth it.
 
Reading Rob's post, it implies that ALL parts will have been received by no later than the end of July and that work will already be underway on the boards by that time as well.

There's only 15 CCV's in the first run. At 2 days build time per amp (conservative estimate, no?), starting on August 1, that would suggest all 15 would be built by September 9.

Based on my entirely arbitrary and unfounded analysis, I am recalibrating my expectations for a mid- to late-September visit by UPS.....
 
Now, in the interests of instilling some levity into this situation.....

WheresOurCCVs.jpg


:D
 
rlord1974":1k7lwcvb said:
Reading Rob's post, it implies that ALL parts will have been received by no later than the end of July and that work will already be underway on the boards by that time as well.

There's only 15 CCV's in the first run. At 2 days build time per amp (conservative estimate, no?), starting on August 1, that would suggest all 15 would be built by September 9.

Based on my entirely arbitrary and unfounded analysis, I am recalibrating my expectations for a mid- to late-September visit by UPS.....


Remember that they are going to test them, etc to ensure uniformity so that could take a little longer.
 
johnpace2":3tp2v582 said:
rlord1974":3tp2v582 said:
Reading Rob's post, it implies that ALL parts will have been received by no later than the end of July and that work will already be underway on the boards by that time as well.

There's only 15 CCV's in the first run. At 2 days build time per amp (conservative estimate, no?), starting on August 1, that would suggest all 15 would be built by September 9.

Based on my entirely arbitrary and unfounded analysis, I am recalibrating my expectations for a mid- to late-September visit by UPS.....


Remember that they are going to test them, etc to ensure uniformity so that could take a little longer.

So, what are you saying? I should expect to receive it with.....

CS401_Santa%20on%20Rooftop.jpg
 
A few random photos to represent the sequence of emotions that everyone is having right now. :D

6c_1.jpg


Funny-Pictures-Part-53_210.jpg


MyDriver.jpg


FYeah.jpg
 
turtlefingers":1xb9mh93 said:
rokker":1xb9mh93 said:
I'm starting to feel cursed...every gear related move I make usually is not in my favor.
Either I sell at a loss to get something I think will work out only to be disappointed and wishing I had something I used to own.
The Cameron Jose I sold to get the CCV is cursing/haunting me.....please remove the evil spirits, maybe I need a seance with some other kind of spirits.
IF I can wait this one out it better work for me....as Brad knows I'm having trouble waiting...never waited this long for anything...EVER.

I know what you are talking about!
:lol: :LOL: :lol: :LOL: :lol: :LOL:

I payed Mark in full in April 2010 for the CCV.
I dealt my place in the line for another amplifier with a guy last month...

The amplifier comes with scuffs and tears on the tolex, broken impedance switch and no power cord!
I sold it now to see if the cursing circle ends!
:doh: :cry:
You were supposed to destroy it. :doh:
 
Board stuffing starts beginning of next week. Boards are due in tomorrow. Chassis in two weeks tops. Amps will start shipping end of August first week of September :rock: The new CCV is going to kill and all you guys with the old ones will be selling them off to get in line, kicking yourself in the ass for not getting in at the beginning. :bash: The wait will be forgotten about in all the hype. Tell them Brad. :rock: Whos gonna get the last laugh. If you knew who Barrang made amps for you wouldn't be laughing. :cry: :yes:
 
glip22":1chlvtmd said:
Board stuffing starts beginning of next week. Boards are due in tomorrow. Chassis in two weeks tops. Amps will start shipping end of August first week of September :rock: The new CCV is going to kill and all you guys with the old ones will be selling them off to get in line, kicking yourself in the ass for not getting in at the beginning. :bash: The wait will be forgotten about in all the hype. Tell them Brad. :rock: Whos gonna get the last laugh. If you knew who Barrang made amps for you wouldn't be laughing. :cry: :yes:


sorry brother , but i gotta laugh at that .... :lol: :LOL: :lol: :LOL: :lol: :LOL:
 
dawnofdreamx97":g042wtdx said:
glip22":g042wtdx said:
Board stuffing starts beginning of next week. Boards are due in tomorrow. Chassis in two weeks tops. Amps will start shipping end of August first week of September :rock: The new CCV is going to kill and all you guys with the old ones will be selling them off to get in line, kicking yourself in the ass for not getting in at the beginning. :bash: The wait will be forgotten about in all the hype. Tell them Brad. :rock: Whos gonna get the last laugh. If you knew who Barrang made amps for you wouldn't be laughing. :cry: :yes:


sorry brother , but i gotta laugh at that .... :lol: :LOL: :lol: :LOL: :lol: :LOL:
:lol: :LOL: :lol: :LOL:
 
Why wait? Get the real thing now. Look on the classifieds....

Too late......it came and went in the blink of an eye. :thumbsup:
 
psychodave":2srzfb8o said:
dawnofdreamx97":2srzfb8o said:
glip22":2srzfb8o said:
Board stuffing starts beginning of next week. Boards are due in tomorrow. Chassis in two weeks tops. Amps will start shipping end of August first week of September :rock: The new CCV is going to kill and all you guys with the old ones will be selling them off to get in line, kicking yourself in the ass for not getting in at the beginning. :bash: The wait will be forgotten about in all the hype. Tell them Brad. :rock: Whos gonna get the last laugh. If you knew who Barrang made amps for you wouldn't be laughing. :cry: :yes:


sorry brother , but i gotta laugh at that .... :lol: :LOL: :lol: :LOL: :lol: :LOL:


Me too :hys:
:emofag: :grim:
 
Back
Top